SydneyNews
  • News
  • Economy
  • Culture
  • The science
  • Travel
  • Food
  • Celebrities
SydneyNews – the latest city news
  • News
  • Economy
  • Culture
  • The science
  • Travel
  • Food
  • Celebrities

Technical examination of buildings: what is it itself?

  • January 17, 2019

The procedure for technical survey of buildings can be carried out at various stages of the existence of buildings, more details on the site:

Building.

Operation.

Post -e -operating period.

At the construction stage, certain issues may appear regarding the fixing of the compliance of construction and installation work with the characteristics established by a specific project. In addition, during the resumption of construction work at a preserved facility, technical confirmation of which designs are used there. In this situation, a technical examination is carried out in selective order. Often, the check affects the most important structural details that were installed and prepared for the time of conservation.

As for the examination of the buildings at the exploitation stage, this is required when a planned verification of the state of real estate, as well as after any emergency situations (fire, flooding, etc.). This provides an opportunity to determine the damage obtained as a result of a specific incident.

As for the audit during the post-sequisition period, it may be required if any extension, redevelopment or change in the functional purpose of a particular object. In this situation, technical indicators of the structure and certain building structures are established. Self -trial calculations are additionally performed, defective statements are formed, and detailed recommendations are issued regarding the restoration of the normal state of the structure.

Examination methods

To date, several common methods of technical examination are used:

Instrumental (control of the strength indicators of buildings).

Visual (viewing the existing design).

In the process of work, the defects and the performance of verification calculations are required to be recorded. In particular, experts pay attention to the following problems:

Destruction of the protective part of the reinforcement.

Cracks present on load -bearing details (beams, columns, walls and pieces).

Leaks and fungal wall damage.

All the pictures received are added to the final report along with the results of the examination and the conclusions.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

The advice of the designer

  • January 23, 2025
View Post

What is Latvia and whether it is worth moving there

  • January 22, 2025
View Post

How to draw up an agreement on sale and sale in Turkey

  • January 17, 2025
View Post

Requirements for the purchase of industrial real estate

  • January 9, 2025
View Post

What other mistakes do they make when buying real estate in Spain

  • December 27, 2024
View Post

Choosing a shower set

  • December 19, 2024
View Post

What are the prices of real estate in New Zealand

  • December 19, 2024
View Post

Choosing a firewood for a bathhouse

  • December 18, 2024
Featured Posts
  • How to make a canopy at the country with your own hands
    • September 25, 2018
  • Italian furniture is the best option for home
    • September 6, 2018
  • Shower that saves!
    • August 10, 2018
  • Decorative lamps
    • June 7, 2018
  • Design of a small children’s room
    • July 10, 2018
Recent Posts
  • The repair scheme of the premises.
    • January 27, 2025
  • Is it possible to install webcams in the apartment for rent
    • January 27, 2025
  • Construction of a country house: Project purchase stage.
    • January 24, 2025
SydneyNews – the latest city news
  • © SydneycityNews.com, 2017-2024.

Input your search keywords and press Enter.