SydneyNews
  • News
  • Economy
  • Culture
  • The science
  • Travel
  • Food
  • Celebrities
SydneyNews – the latest city news
  • News
  • Economy
  • Culture
  • The science
  • Travel
  • Food
  • Celebrities

How to make a screed under a laminate

  • October 11, 2018

To align the floor is an important part of the work during the laying of the flooring. The laminate screed is necessarily made if the floor has irregularities and many defects. The floor is aligned with screed, stiffness is given, pipes, communications are disguised, good isolation is provided. If you want to buy coffee machines for vending, we advise you to contact Vendaprofi. The company offers the best coffee machines at low prices.

First, we are freed from furniture, remove skirting boards, tiles, linoleum, clean the base to the concrete slab, removing all the small garbage. We denote the line of the screed horizon on the walls of the room using a level, putting the marks every couple of meters, and connect. In this case, the thickness of the screed should be up to four centimeters. The next step is to apply a special primer of deep penetration, laying a bitumen tape, set the beacons.

When using a special mixture, it is prepared according to the instructions. If the floor is poured with cement mortar, prepare, taking three parts of the sand, adding cement and water. All this needs to be constantly interfered. The solution is distributed on the floor evenly. Half an hour after laying, the screed is wiped with graters to a flat surface. All this needs to be done in one day. Then three days after, the surface must be wetted with water, so that there are no cracks.

Then everyone is covered with a plastic film, pouring the sand moistened with water, leaving all this for ten days. Five days later, remove the film, the screed is left to dry for half a month. After that, they are already laminated.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

How to get a residence permit in Latvia

  • January 21, 2025
View Post

Pre-Paul Paul

  • January 15, 2025
View Post

The tasks that are set before industrial marketing

  • January 14, 2025
View Post

Features of the acquisition of industrial real estate

  • January 10, 2025
View Post

Nuances when choosing a place for construction

  • January 6, 2025
View Post

There are a number of errors that are made when buying a house in Spain

  • December 26, 2024
View Post

When to build a house: in winter or summer?

  • December 25, 2024
View Post

Choosing wood for building a wooden staircase

  • December 18, 2024
Featured Posts
  • How to choose a design project of a summer cottage
    • April 16, 2018
  • How to choose a snowmobile for home
    • October 8, 2018
  • DIY house
    • August 1, 2018
  • Facade painting technology
    • February 1, 2019
  • How to choose high -quality children’s swings
    • March 27, 2018
Recent Posts
  • The repair scheme of the premises.
    • January 27, 2025
  • Is it possible to install webcams in the apartment for rent
    • January 27, 2025
  • Construction of a country house: Project purchase stage.
    • January 24, 2025
SydneyNews – the latest city news
  • © SydneycityNews.com, 2017-2024.

Input your search keywords and press Enter.