Burning of water wells is carried out with the aim of creating an autonomous water supply of a country house, plot, industrial or construction facility. Today, many consumers choose an Abyssinian well. Its folk name “Needle”. Moreover, the scientific explanation of this system is based on the creation of a structure for an active water intake. In order to find out about the work of the well and purchase the necessary equipment for it, you should find a stable company that has not been engaged in the provision of these services in the market.
Drilling wells for water in Chekhov and other areas of the Moscow Region, this is a magnificent arrangement of the water intake structure, which is made using a manual method. In this case, there is no need to use bulky equipment. In addition, the system of the Abyssinian well is endowed with numerous advantages. Firstly, handmade is successfully done in the most difficult and constrained conditions. This work delicately and accurately perform, as a rule, only two specialists. The design can be located in a private house or basement. Its operational period significantly exceeds the service life of the sandy structure and is about 20 years.
The drilling of wells in the Ruzsky district manually takes much less time (not more than 6-8 hours) and can be produced in the winter season. The performance of this structure is high and is from 1 to 3 cubic meters per hour, at a pressure of up to 3 atmospheres. The product makes access to high -quality water. Moreover, its cost is minimal and affordable to many consumers. The manufacturer, as a rule, provides a warranty period for the measures performed, on average, which is three years. All necessary conditions and warranty obligations are certainly prescribed in the relevant agreement.
Thus, ordering the drilling in Kolomna of this water well, you get a structure that has high technical characteristics. Firstly, a depth of up to 15-20m in terms of average indicators. Secondly, with the diameter of the pipes used, which is about 30 mm. In addition, work is carried out on the aquifer – large sand, saturated with water. The filter is used as a treatment system, and an electric pumping station or manual pump can be used to raise water. The design of the structure is from 20 to 40 liters per minute (3 cubic meters per hour).